How Long Does Door Installation Take?

There are two clocks: how long until the door arrives, and how long the install itself takes on the day.

Short answer

A straightforward same-size door replacement is often done in a single day once the door is on site. Full-frame work, stucco patching, structural changes or a large multi-slide unit take longer. Ordering usually takes longer than the install, because many doors are made to size. Ask your installer for both timelines in writing.

The install itself

On install day, a typical replacement goes roughly like this:

  1. Protect floors and furniture near the door
  2. Remove the old panels and, for full-frame jobs, the old frame
  3. Check the opening for square, level and any water damage
  4. Set the sill pan and flashing, then the new frame
  5. Install the panels, adjust them and check the lock
  6. Seal and trim inside and out, then clean up

A retrofit patio door, where the new frame goes inside or over the old one, is usually the quickest. See what a retrofit patio door is.

What makes it take longer

  • Full-frame removal in a stucco wall, which needs patching and sometimes a second visit for finish work
  • Rot or water damage found at the sill once the old door is out
  • A wider opening or new header
  • Turning a window into a door
  • Large multi-slide or bifold units, which are heavy and need careful setup
  • Permit inspections, where required

Stucco patching and paint can add time after the door itself is in. Our page on door replacement in stucco walls explains why.

Want the price in writing? Tell us what you need and a vetted local installer will walk your home and send an itemized quote. No in-home sales pitch.

Ordering time

Many patio and entry doors are built to order. The wait depends on the manufacturer, the product line and the options. Custom colors or sizes can add time. We do not quote a number, because it changes. Ask the installer for the current lead time for the specific door, and get it on the quote.

Most installs happen about 4 to 8 weeks after you sign, depending on the product, and the date is written on your quote.

How to plan

  • Clear a path to the door and some space inside
  • Plan for pets and kids while the opening is open
  • Ask whether the opening will be closed up at the end of each day
  • Confirm who handles any stucco, paint or drywall work

For more on styles and materials, see the doors guide. When you ask for a written quote, ask for the expected install time and the lead time on the same page.

Related questions

Will my house be open overnight?

For most same-size replacements, no. Ask the installer how the opening is secured if the job runs past one day.

Get your price in writing.

Get a Written Quote

No in-home sales pitch. No "today only" price. Just the windows you need, priced line by line.

Get a Written Quote